Castlewood Park Restrooms

Share on Facebook Share on Twitter Share on Linkedin Email this link

Consultation has concluded

Greenwood Village will be replacing the port-a-let at the Castlewood Park with a plumbed restroom that would be built as an addition to the existing building. A Public Meeting was held at City Hall on November 15, 2018.

Restrooms will have electronic locks that will allow for them to be locked from dust to dawn. This project is being funded 25% by Village Funds and 75% by a grant from Arapahoe County Open Space Funds.


Greenwood Village will be replacing the port-a-let at the Castlewood Park with a plumbed restroom that would be built as an addition to the existing building. A Public Meeting was held at City Hall on November 15, 2018.

Restrooms will have electronic locks that will allow for them to be locked from dust to dawn. This project is being funded 25% by Village Funds and 75% by a grant from Arapahoe County Open Space Funds.


Consultation has concluded
  • Construction Underway

    Share on Facebook Share on Twitter Share on Linkedin Email this link
    supporting image

    Construction commenced in June for new restroom facilities at Castlewood Park and the High Line Canal Trailhead. These plumbed restrooms, which will replace the existing portable toilets at both locations, will also include water fountains and water bottle filling stations. Construction is anticipated to be completed in September 2019.

    Please note that during construction, parking at Castlewood Park and the High Line Canal Trailhead may be limited or unavailable. To allow for utility connections, a short closure of Orchard Drive between Holly Street and Ivanhoe Street will be necessary.